just freaking out a little over getting organized for the next install of plastic fantastic.
the 5 foot triangle panels of water bottles are trapped in the basement in three tidy piles, about 5 feet high each. one stack is actually more like 10 feet cuz it's two panels that are still connected. plus there are 4 bags or so of bottles that had fallen off in the move from studio 34 to the basement. we used hand trucks and had created a neat little platform to stack them. it went smoothly for the most part.
though every time we move a panel bottles fall off.
it just seems like so much work for such a short outing. having doubts. and this is naturally part of the process, or so i recently advised someone on her art pursuit.
pedal co-op is looking into their availability to help with the move of these panels to the field next to the water works.
there's an art opening at city hall on june 8, where three little water bottle cap puppet critters will be exhibited. they are all cute. they are titled "i'm cute" "you are cute" and "i'm cuter than both of you"
so
tuesday, june 8
5pm art opening at city hall
7-10pm take the panels out of the basement and prepare them to be moved. ?? maybe or do we wait til the morning
wednesday june 9
skip work
9am load the bottles onto trailers
10 am leave west philly and slowly bike to location
11 am unload and start building
planning yes planning
it's going to be ok. it will all work out. lots of friends are stepping up. and it's going to be great.
the end.
?
Episode 952: Tali Halpern
2 days ago

0 Comments:
Post a Comment